The RhinoBond metal retrofit installation is a three-step process:
- Fill the flutes with loose laid insulation.
- Secure a cover board to the purlins with RetroDrill Fasteners and round RhinoBond Plates for membrane attachment. Additional non-RhinoBond insulation fasteners may be required per FM guidelines.
- After the membrane is installed, weld each plate using the RhinoBond tool.


