ASSEMBLED SCREWS & PLATES
(2 men: 1 placing ASAPs/1 fastening)
| × | 8.2 sec. per fastener* per 2-man crew divided by 3600 sec. per hour |
= | 0.00 Hours to Install |
|
| × | 2 men times 0.00 Hours |
= | $0.00 Total Labor Cost |
|
| × | # of Fasteners divided by 1000 |
= | $0.00 Total Material Cost |
|
| $0.00 TOTAL COST |
||||
ACCUTRAC SYSTEM (1 man using AccuTrac tool)
| 1000 Total # of Fasteners |
× | 5.5 sec. per fastener* per 1-man crew divided by 3600 sec. per hour | = | 0.00 Hours to Install |
| 0.00 Hourly Labor Rate |
× | 0.00 Hours | = | $0.00 Total Labor Cost |
| × | # of Fasteners divided by 1000 |
= | $0.00 Total Material Cost |
|
| $0.00 TOTAL COST |
||||
YOUR SAVINGS!
| HOURS SAVED | 0.00 | |||
| LABOR & MATERIAL COST SAVED | $0.00 | |||